London Borough of Barnet Tree Policy

      The HGSRA has enjoyed a close   are assessed for this, and if found                                           Replacement planting will   be carried out. Cosmetic works
      working liaison with Barnet   appropriate, managed according                                               follow a three year cycle, where   will  not  be  considered  unless
      Council’s Tree Officers for more   to guidance published by the                                            50% of trees removed during   considered reasonable to be
      than 20 years, focussing primarily   London Tree Officers Association                                      any financial year will be   undertaken by the Tree Officer.
      on restoring the Suburb’s original   (LTOA) referred to in all recent                                      replaced in that year, 25% in   (2.38)
      planting design, which included   court cases by the judiciary. This                                       the second year and the final   Tree removal will not be
      street tree species. A presentation   recommends a system of cyclical                                      25% in the third year. (2.25)  considered if there is little risk
      at Fellowship House by Andy   maintenance, selective removal                                                  Priority  will  be  given  to   associated with tree retention.
      Tipping, the LB Barnet Trees &   where justified following a claim                                         main roads, streets where major   High risk zones will be identified
      Woodlands Manager, last year gave   and where evidence is conclusive,                                      tree removal is necessary, where   and trees within these zones
      an overview of the new Barnet   and  occasionally  root  barrier                                           substantial mature trees have   will be inspected following
      Tree Policy published in 2017.  installation below ground. (1.22,                                          been removed, and where    significant storms. (2.39)
         This article summarises some   1.23, 1.25)                                                              resident contact has been    Wherever possible and safe,
      sections of the Policy dealing with   Planned maintenance is                                               received requesting replanting.  trees will be allowed to fall
      common queries from residents.   carried out as a three year cycle                                         (2.25)                     naturally to promote biodiversity
      The full policy can be seen on   following tree surveys that identify                                         Planting will prioritise larger   and habitat enhancement. This
      the Council’s website at: www.  any necessary works. This work                                             growing, shade-providing trees   includes retaining standing
      barnet.gov.uk/citizen-home/  concentrates on maintaining trees                                             following Urban Heat Island   deadwood. (2.42)
      parks-sport-and-leisure/trees/  in their immediate environment                                             targets scaling down to smaller
      tree-policy.html. Figures at the   with due regard to encroachment,                                        ornamental trees where larger
      end  of  paragraphs  refer  to   shape, future growth of tree, and                                         trees are not suitable.
      paragraph numbers in the Policy.  subsidence risk management.                                                 This will also be the case
       LB BARNET TREE POLICY     (2.1)                                                                           where trees have been removed
      LB Barnet has a Tree Policy   Works outside the cyclical                                                   for subsidence reasons. (2.27)
      relating to trees on land owned   pruning cycle may be carried                                               Parks and Open Spaces
      by the Council, including street   out if a tree is found to be in an   Horse Chestnuts outside 64 & 66 Northway containing telephone contact   Trees are managed to maximise
                                                            when remedial pruning cannot
      trees, parks and open spaces. A   unreasonable condition in the   be undertaken or an engineered   details. (2.16)  their landscape amenity and
      small team of qualified and   context of neighbouring properties,                                          wildlife value. Therefore only
                                                            solution cannot be implemented.
                                                                                         Work considered urgent or
      experienced arboriculturists is   or  a  tree  is  missed  from the   (2.4)     in the interest of public safety   essential works for health and
      employed directly by the Council,   cyclical maintenance program.   Where street trees are growing   will be  carried  out within  24   safety and subsidence risk will   Stump outside 64 Northway
      and all work is carried out by   (2.10)               at an angle, action required in   hours. No notice will be given
      contractors employed on fixed   Works in response to a
      terms. (0.1, 0.2)          query are carried out monthly   each case will be assessed on its   prior to the works being carried   Children’s Hallowe’en
                                                                                      out. (2.19)
                                                            merits.(2.35)
         The policy outlines how the   where the Tree Officer deems   Where tree removal has been   Tree Planting
      Council manages a healthy, diverse   work to be necessary. (2.2)  requested by residents and this   The plan for the next five years   One of the main events of the   teller, Hannah Brailsford, enthralled
      and extensive tree stock, and   Urgent works are usually                                                   year for little people in HGS is   the kids with her tales, while artist
      why certain works are carried   prompted by resident contact   removal is assessed as unjustified   is to increase the number of   the RA’s Hallowe’en Party, held   Vera Moore supervised artwork
                                                            by council officers, if resident is
                                                                                      trees and canopy cover across
      out on certain trees. (0.3)  and can be caused by adverse   not satisfied, there is a review   the Borough, targeting areas   in the peaceful environment of   and designs, and her daughter
         Relevant issues considered by   weather, vehicle damage or tree                                         Fellowship House!          Lera handled the face-painting
      the Tree officers are aesthetics, risk   failure.  They  are  usually  dealt   and complaints procedure. (2.5)  with the highest levels of NO2   So popular, it was fully booked   area. Talented pastry experts kindly
                                                                Refusal of works
      management, resident concerns,   with within seven days or if   Tree work will not normally be   concentrations and high Urban   and we had a waiting list. The   provided the cakes, which were
                                                                                      Heat Island temperatures. (2.22)
      ecosystem services delivery (Urban   found to be an emergency will   carried out if it is outside the   The program is to achieve a   hall was packed with children   quickly eaten.
      Heat Island management, shade to   be dealt with immediately or   Policy, and works will normally   net gain in trees across the   dressed up as princesses, pirates   A good time was had by all
      reduce temperatures, biodiversity,   within 24 hours depending on                                          and ghosts. A new dynamic story-  and it ended far too soon!
      flood alleviation) national and   condition. (2.3)    be refused if requested for the   Borough so:
                                                                                         Vacant tree pits i.e. locations
                                                            following reasons:
      city-wide targets. (1.5, 1.6)  There is an out-of-hours   •  Interference with satellite dish/   where trees have been before,
          Tree maintenance       service on 020 8359 2000.  TV reception.             but have not yet been replanted                                                TONY BRAND
            and subsidence          Removal of healthy trees is
      Trees which may present a risk of   undertaken only in exceptional   •  Resident’s perception that tree   have been identified and plans
                                                            is too large.
                                                                                      made to increase the numbers
      building damage from subsidence   circumstances only,  normally
                                                            •  Obstruction of view or light.  of trees each year.
                                                            •  Seasonal nuisance eg. leaf fall.  Where tree removal is
                                                            •  Resident’s perception that tree   necessary, the Council would
                                                            will cause damage in the future.  look to plant a new tree on a
                                                            •  To replace a healthy mature   one to one ratio. If the original
                                                            tree to create space for planting   site is inappropriate to re-plant,
                                                            of new trees. (2.9)       a more suitable location within
                                                              10 working days notice of   the immediate area will be
                                                            tree removal is given using signs   designated. (2.28)
                                                                                            Letters to the editor

                                                            Middleway, NW11           put  into place  when  hard  winter   We encourage readers to report   there is that censorship. Imagine a
                                                            Bin Collection Day change   conditions caused huge potholes.   problems in their areas as they are   rule that the government could
                                                            Dear Sir,                    Turning to pavements, we have   best placed to do so but if the issue   only be criticised in the House of
                                                            Since the above, our collection has   also put pressure on LB Barnet via   is not fixed they should contact   Commons with its prior approval.
                                                            not been as it should. We have had   the Councillors to replace numerous   their local Councillors.  Yours
                                                            only one bin emptied per week and   sections of dangerous paving in the         David Iwi
                                                            this week even the green bin wasn’t   area. LB Barnet recently carried out
                                                            emptied! I have tried contacting   their own extensive survey of paving   Raeburn Close, NW11  The Trust’s reply:
                                                            Barnet Council who do nothing, and   throughout the Suburb using third   Dear Sir  The Trust’s position is that it has
                                                            have had to bother our Councillor   party contractors in October 2018   You report that there were no upsets   complied with its duties; legal and
                                                            twice to get things moving.  and we  hope this  will result in   at the Trust’s AGM last September.   accounting advice have confirmed this.
                                                            Yours                     some comprehensive improvements   There is a bizarre provision in the   Mr Iwi requested in writing
                                                            Hannah Colton             to the safety of our paving.  Trust’s constitution that a resolution   (in  accordance  with  the  Trust’s
                                                                                         Our Councillors would tell you   can only be proposed with the   constitution) that a resolution be put
                                                            Editor:  See article on front cover   that they hear from the RA very   prior consent of the Trust Council,  to the AGM on this matter. The
                                                            and Barnet’s statement on p2.   frequently on things that need   with the result that the more   appointed and elected trustees
                                                                                      dealing with: flipped kerb stones   indefensible its actions, the greater   rejected the request as they are
                                                                                      (a frequent occurrence); dumping   the incentive for it to refuse consent.   entitled to under the constitution
                                                            Meadway, NW11             in Bute Mews behind Market Place;   In this instance, despite the large   on the basis that the draft
                                                            Dear Sir                  fallen trees; water leaks which the   increase in the level of staff over   resolution contained matters put
                                                            I am extremely unhappy about the   water companies seem to ignore.   the years, the Council refused   to the last three AGMs by Mr Iwi
                                                            condition of roads and pavements   The list goes on and on. We are also   consent to discuss at the AGM a   and contained nothing new.
                                                            in the Suburb.            frequently in touch with the area   proposal that there should be a   Mr Iwi has not adduced any
                                                               I know it is the responsibility   representative from LB Barnet to clean   management review. Trust meetings   support for his proposition among
                                                            of Barnet Council, but surely it is   up rubbish, including the frequent   will continue to be a charade while   other Trust members.
                                                            the communication and pressure   fly tipping of builders rubble/
                                                            the HGSRA put on them on behalf   household waste and mattresses.
                                                            of the residents that should result   As a reminder, LB Barnet has   P R HARTLEY
                                                            in an acceptable environment?  an online process to report issues
                                                            Yours                     www.barnet.gov.uk/citizen-home/
                                                            Suburb Resident           council-and-democracy/report-it-  CHARTERED ACCOUNTANT
                                                                                      now.html.                       & REGISTERED AUDITOR
                                                            Response from Emma Howard    Water leaks should be reported
                                                            Chair, HGSRA:             to Thames Water at www.thames   Accounting & Taxation Services
                                                            Working with our local Councillors,  water.co.uk/Help-and-Advice/
                                                            members of the RA pushed very hard   Report-a-problem/Report-a-
                                                            to get much of Meadway, Hampstead   problem?type=leak.    Call 020 8731 9745 or 07850 634395
                                                            Way, Kingsley Way, Bigwood Road,   Some of our water pipes come   Email paul@prhartley.co.uk
                                                            Thornton Way and Wildwood Road   under Affinity Water: reportable at   www.prhartley.co.uk
                                                            (plus other local roads) resurfaced in   https://myonlineaccount.affinity
                                                            Spring 2018, plus temporary fixes   water.co.uk/ReportaLeak/Index.
      8                                                                                         SUBURB NEWS IS PRODUCED AND DELIVERED TO YOU BY RESIDENTS ASSOCIATION VOLUNTEERS
 2197 Suburb News 2015 Ad PRINT.indd   1           22/07/2015   15:11:23
   3   4   5   6   7   8   9   10   11   12